Back Forward Flow form
Editing in Process Modeler — Connectors and flow actions

About Flows
  1. About 
  2. New 
  3. Diagram 
  4. Parameters 
  5. Pages & Classes 
  6. Design 
  1. Process 
  2. Specifications 
  3. Requirements 
  4. Test Cases 
  5. History 
  6. More... 

Use connectors to connect a shape in the flow with the next shape, to indicate a possible path for the flow execution.

NoteDon't confuse connectors with Integrator shapes, which support connector interfaces from a PRPC system to another system, using Rule-Connect- rules.

NoteYou can use the notation param.name in a field to refer to a flow parameter.

  Understanding connectors

  Adding a connector to the flow

  Completing the Connector Properties panel

  Case 1: The connector leads from an Assignment or Assignment Service shape

  Case 2: The connector leads from a Decision

  Case 3: The connector leads from a Utility, Integrator, Subprocess, Split For Each, or Split Join

  Moving or rerouting a connector

  Status indicators on connectors

  Deleting a connector

  Results

  Refining likelihood probabilities

  Making a local action appear first

Up About Flows